Updates
Mechanical
- Keel ready for final assembly except for hole through the hull - John working on jig
- New deck is lasercut, needs to get glued to the hull
- Dedicated mechanical session next Monday
- Stand mostly assembled, need to get lasercut pieces right and then test that it can hold weight, then epoxy wood pieces to waterproof
- Jake working on interface between deck and wingsail mast
- Jules finished ballast part, looking to put in assembly and test
Electrical
- Need to finish soldering SMD components, then start testing PCB
- Ultrasonic anameometer, still working on testing transducers - goal to have PCB designed and design review by end of semester - have mechanical task for casing for it at some point as well
Firmware
- Sergio and or Yaseen to run integration test with wind vane + servo control loop
Software
- Set up Raspberry Pi
- Set up network for Heltec radios
Having everyone attend at least Monday and/or Wednesday work session to help with integration
Sebastian working on detailed flowchart for manufacturing/assembly