RobotX 2026
Weekly Sprint 7 Meeting
April 13, 2026
We are so back (in Notion)

Meeting Overview
<aside>
<img src="/icons/exclamation-mark-double_red.svg" alt="/icons/exclamation-mark-double_red.svg" width="40px" />
Primary Semester Goal
Vehicle readiness video prior to finals
</aside>
Agenda
- Test Review
- Test Planning 101
- Status Update
- Sprint Progress
Upcoming Events
- Work Sessions M-Th 6-8PM
- 4/16 Dry Test
- 4/18 Next Lake Test
- 4/14 @10am Water Jetting at the Invention Studio
Things to Know
Test Planning 101
Procedure
- Determine what needs to be tested
- Create a test entry in the MRG Test Database
- Write a test plan in the entry
Dry Test
The purpose of the dry test is to maximize lake testing time, by integrating all code early.
Do
Don’t
- Merge code at the lake
- Merge code morning of the test
Status Update
Bills and Purchases
- We have the logic shifters now
- Should be able to electronically assemble the PCBs
- Do we need to buy anything last minute?
Test Planning
- Someone needs to write out a dry test and a test plan for the 4/18 test
BlueBoat 05