Mechanical Subteam
- Wingsail delayed due to access to CNC Router
- Keel design mostly done
- Need to figure out parts. Manufacture
- Rudder installed/functional
- Move ahead on manufacturing of wingsail mount
- Prototyping new encoder hardware
- Need to design test mount for wingsail - Alexander
- Must mimic the conditions and mounts the same way to the actual boat
-
Electrical Subteam
- Chinmay - working on block diagram still
- Inside electrical box
- Arduino IDE - test and validate firmware
- Download tutorial programs and test all the sensors
-
Software Subteam
- Begin getting started with Arduino IDE and designing some test software
- Simulation almost set up
-
Design Reviews
- Wingsail, keel, rudder, mechanical integration, electrical diagram
- Tentative dates:
- Rudder - fully designed - April 11th
- Wingsail - April 11th
- Tailwind actuator - needs some redesign
- Wingsail mount
- Keel - April 11th
- Electrical - needs work