Title:
Review Date:
Review Type: PDR (Preliminary Design Review)
Subteam:
Revision:
Responsible Engineers:
Reviewers:

Introduction

  1. Revision history: one sentence update on what this revision changes from previous revisions
  2. Introduction: brief description of what this subsystem is / is doing
  3. Purpose: why does this subsystem need to exist
  4. Scope: what is in this document

The Design

Requirements

  1. Core Functionality: what this system does
  2. Performance Metrics: how can the design be evaluated AND target performance

Research

  1. Alternative Enumeration: how is this done today?
  2. Alternative Analysis: what are the pros+cons of these methods

Key Assumptions

Design Details (selected design)

  1. Description: pictures, sketches, block diagram, CAD, algorithm, …
  2. Interfaces: what data/resources enter and exit this system
  3. Performance Analysis: estimation of performance metrics (math preferred)
  4. Risk & Mitigation: how can this design fail & backup plans (redundancy + what is hard?)