Responsible Engineers: Em & Thalia

Screenshot 2026-04-08 at 12.07.30 AM.png

Screenshot 2026-04-08 at 12.02.35 AM.png

estop (physically controlled) and Presto II (remote e-stop and indicator lights) boards do need to be added

Assem1.SLDASM