September 13, 2025 9:13 AM (EDT) : left lab around 9, potential improvements in removing old items from checklist, smaller pre-packed boxes, having things curbside earlier, could have WAM-V more disassembled day before

September 13, 2025 10:02 AM (EDT) : change procedures: ratchet straps down before underslung platform

September 13, 2025 10:03 AM (EDT) : consider flipping the carts

September 13, 2025 10:03 AM (EDT) : pump cart tires prior

September 13, 2025 10:05 AM (EDT) : print covers for pontoon valves

September 13, 2025 10:21 AM (EDT) : look for trailer sponsors

September 13, 2025 10:24 AM (EDT) : tighten box mounts

September 13, 2025 10:34 AM (EDT) : arrived at lake at 9:30

September 13, 2025 10:34 AM (EDT) : underslung attached

September 13, 2025 10:37 AM (EDT) : at sweetwater, assemble in 2x parking spots

September 13, 2025 10:52 AM (EDT) : make screws for motor power cables shorter

September 13, 2025 10:52 AM (EDT) : plug in control not in procedure

September 13, 2025 12:28 PM (EDT) : 1 pot died after remote kill, port side - refused to work

September 13, 2025 12:34 PM (EDT) : left the lake